Projects & Partners
In the cold season and in cold places, the optimization of energy consumption is further discussed and sometimes to achieve the desired conditions, energy is wasted tremendously, while the desired conditions are not provided.
The use of "self-regulating heat cables" for the following applications facilitates works and saves energy efficiently:
- Prevent freezing of pipes, facilities and water tanks in the open environment in the cold season.
- Prevent snow settling and freezing on transceiver antennas and related bases.
- Keep the water temperature inside the hot pipes constant and remove the return pipe.
- Preventing snowfall and preventing frost on roofs and terraces, river water, airport runway, station, helicopter landing site in towers, slopes, bridges and overpasses, sports fields and other places that The presence of snow and ice is dangerous and causes problems.
- Creating uniform heating in rooms, halls, baths, saunas, greenhouses, animal shelters, etc. invisibly by installing under floors.
- Prevent temperature drop for better and faster passage and movement of fluids in pipes in various industries such as power plants, oil, gas, petrochemical, food, and pharmaceutical and so on.
- Keeping the temperature of fixed and moving barrels, tanks and communication pipes of lubricants constant (permanent andtemporary / portable installation)
- Equipping the roof and waterways of the roof terminal of Imam Khomeini International Airport.
- Ail Goli Tabriz city train terminal underfloor heating to prevent snow.
- Equipping the water of the roof roads of one of the Tabriz city train stations.
- Roof of the private hangar of Mahan International Airlines at Imam Airport.
- Roofs and canals of Pars Ceram factory in Qazvin.
- Waterways of a commercial project in Mashhad.
- Waterways of a residential-commercial complex in Shemshak, Tehran.
The mentioned projects are among the national projects carried out by this company, which in addition to providing the required goods and equipment abroad, has also been responsible for the design, installation, implementation and commissioning of this new system.